Description: Modernization of existing MEP system to a distributed redundant topology (4 to make 3 system).
Builder: HITT Construction Year Completed: 2019 Tier: 3+ PUE: 1.43 IT Plug Load: 3.6MW @ N+1
Hyper-Scale Data Center
Miami, FL
Description: Data Center Infrastructure Master Plan. Primary network exchange point between the United States and Latin America 22x3MW Diesel-Generators. Upgrade 180,000 gallon bulk fuel oil storage system. 7/6 distributed redundant architecture. 600,000 SF Data Halls.
Builder: JT Magen Construction Year Completed: 2018 Tier: 3+ PUE: 1.43 IT Plug Load: 32MW