Top 10 Banking Institution
Secaucus, NJ
Description: Created a CFD model of 16,000 sq. ft. Data Center. Utilizing the model, we verified cooling capacity and remediated hot spots. The entire site energy usage was reduced by 35% with the reduction of setpoints and replacement of inefficient CRAC units.
Tier: 3
PUE: 1.65
IT Plug Load: Scalable up to MW
|